Define the input
List the master and transaction data needed to make the decision.
Raw-material overconsumption
A practical operating guide from the Plan 2 Yield manufacturing-control framework.
The operating problem
A reliable manufacturing decision needs current inputs, an accountable owner, clear rules, and a traceable resolution path.
Outcomes
List the master and transaction data needed to make the decision.
Set validation, authorization, and quantity controls before execution.
Capture movement, output, variance, and commercial impact.
Use recurring exceptions to improve process discipline.
Connected workflow
Keep planned BOM consumption separate from actual issue.
Capture batch-level quantities used for the production log.
Record good, rejected, and scrap output together.
Calculate variance against completed output, not only planned order quantity.
Require a reason for exceptional consumption or manual adjustment.
Review repeated variance by SKU, machine, shift, or vendor batch.
Use the finding to correct BOM, process, quality, or operating discipline.
Capabilities
Next step
Use one real operating example during a guided product demonstration.