Order-feasibility checklist

Seven checks to complete before promising a manufacturing delivery

A practical operating guide from the Plan 2 Yield manufacturing-control framework.

Order controlSO-2026-084
Live
Fulfilment readiness72%
Free stock450units
Production needed750units
RM shortage2items
PO coverage64%covered
Next decision

Generate draft POs for uncovered material

The operating problem

Why this control matters

A reliable manufacturing decision needs current inputs, an accountable owner, clear rules, and a traceable resolution path.

Outcomes

A clearer next action for every team

Define the input

List the master and transaction data needed to make the decision.

Protect the action

Set validation, authorization, and quantity controls before execution.

Record the result

Capture movement, output, variance, and commercial impact.

Review the signal

Use recurring exceptions to improve process discipline.

Connected workflow

Keep context from the first decision through closure

  1. 01

    Step 1

    Confirm the order quantity and required date.

  2. 02

    Step 2

    Check free finished stock after existing reservations.

  3. 03

    Step 3

    Calculate uncovered finished quantity.

  4. 04

    Step 4

    Confirm the active BOM for the required SKU.

  5. 05

    Step 5

    Calculate raw-material demand for uncovered quantity.

  6. 06

    Step 6

    Compare demand with eligible free batches and existing PO coverage.

  7. 07

    Step 7

    Record whether the next action is allocate, produce, procure, or renegotiate.

Capabilities

The operational foundation behind the workflow

  • Confirm the order quantity and required date.
  • Check free finished stock after existing reservations.
  • Calculate uncovered finished quantity.
  • Confirm the active BOM for the required SKU.
  • Calculate raw-material demand for uncovered quantity.
  • Compare demand with eligible free batches and existing PO coverage.
  • Record whether the next action is allocate, produce, procure, or renegotiate.

Next step

See this control inside Plan 2 Yield

Use one real operating example during a guided product demonstration.

Book a Demo